Buildings drawn to be lived in

(Est. 2009) — Porto, Portugal

Eleven architects. Houses, housing, civic rooms and the careful reuse of old buildings — drawn by hand first, followed through to the day the keys change hands.

Browse the drawings
Ground floor plan
Casa Alvor, a small white house on a rocky coast
View from the south-west

Do not scale from this drawing. All dimensions in metres.

(01) — Practice

We would rather build one good room than ten impressive ones. Every project starts on tracing paper and in cardboard, at a scale you can hold.

The partners draw. The people who meet you at the first site visit are the ones who sign the last certificate, and we keep every project small enough for that to stay true.

White cardboard model of a low house on a studio table
Working model, Patio House — 1:50 card
Buildings completed
48
On site today
6
Floor area built (m²)
61,400
Years in practice
17

(02) — Projects

Street elevation

All projects (48)

(03) — Plan of work

Eight stages, one team, from the first conversation to the keys.

A house takes us about two years end to end. Most of that is on site; the drawing that decides it takes twenty weeks.

  1. 0

    Strategy

    Is a building the answer? We read the site, the budget and the brief before anything is drawn.

    2 weeks
  2. 1

    Brief

    Surveys, planning history and a room-by-room list of what you need — and what you only think you need.

    3 weeks
  3. 2

    Concept

    Sketches, card models and two honest options, each with a cost range you can plan around.

    6 weeks
  4. 3

    Coordination

    Structure, services and planning drawings agreed with the engineers and submitted.

    8 weeks
  5. 4

    Technical

    Every joint, door and handrail drawn to 1:5, specified and priced by three builders.

    10 weeks
  6. 5

    On site

    Weekly site visits, one set of minutes, and an architect who answers the phone.

    ≈ 52 weeks
  7. 6

    Handover

    Snagging, the final account and a manual for the house, in plain words.

    4 weeks
  8. 7

    In use

    We come back after a year of living in it and fix what the seasons found.

    1 year on

(04) — Sectors

Schedule of work

All services
RefSectorWhat we doBuiltOn siteTypical area (m²)
S-01HousesNew houses and extensions, from a first sketch to the last door handle.213180–320
S-02HousingCo-operative and rental housing where every flat gets two aspects.711,200–4,800
S-03Civic & sacredChapels, libraries and small halls — rooms a town shares.61300–900
S-04Adaptive reuseOld warehouses, schools and townhouses given a second life.91250–2,000
S-05InteriorsJoinery, lighting and material schedules for rooms we did not build.5060–400
Concrete formwork and steel reinforcement on a building site, in black and white

(05) — On site

Six buildings are going up this week. This is where each of them stands.

  1. Escola Velha, GuimarãesReuse · Stage 5
    Roof on, glazing inHandover Mar 2027
  2. Casa Moinho, SintraHouse · Stage 5
    Frame completeHandover Sep 2027
  3. Biblioteca Lima, Ponte de LimaCivic · Stage 5
    Foundations pouredHandover Jun 2028
  4. Cooperativa Sul, SetúbalHousing · Stage 5
    Ground worksHandover Dec 2028

Site visits every Thursday. Clients are always welcome on them.

Concrete walls lit by a skylight, casting a band of shadow

(06) — Clients

“We asked for more rooms. They gave us fewer, and better ones. Three winters in, the house is still warm and we still find new light in it.”

Helena and Duarte BritoClients, Casa Alvor

Recognition

  • 2025Prémio Secil de Arquitectura — shortlistCasa Alvor
  • 2024Mies van der Rohe Award — nomineeRua do Norte
  • 2023ArchDaily Building of the Year — housingRua do Norte
  • 2022Prémio FAD — interiors, finalistSanta Clara

Bring us a site.

Portrait of Rui Matos at a table with a white model

Rui Matos, founding partnerFirst visits are free within 150 km of Porto. Bring the survey if you have one — we will bring the tape.